| | Standard Course Syllabus | Course Supervisor | Date of Approval |
| | Dept. of Electrical and Computer Engineering | Passino | 3/05 |
| | 758 | Control System Implementation Laboratory |
| | 8. | Engineering Science/Design |
| | EE Specialization: | This course IS NOT an EE core course. |
| | This course CAN be used as an EE technical elective. |
| | This class counts toward area of concentration in Control |
| | This course contributes 3 hours toward the EE lab requirement. |
| | CpE Specialization: | This course IS NOT a CpE core course. |
| | 12 hours of CpE technical electives must be on a prescribed list. |
| | This course IS NOT on that list. |
| | 9. | RELATIONSHIP OF COURSE TO PROGRAM OUTCOMES AND OBJECTIVES |
| | 1(a); 2(a); 3(b) |
| 10. | STANDARD SYLLABUS PREPARED BY |
| | Passino |
| | Date of Approval of Standard Syllabus by Area |
| | 3/05 |
| | Date of Course Evaluation by Area |
| | ASSESSMENTS |
| | 6 labatory reports, 6 pre-lab assignments, 1 final project report and presentation to faculty and students |
| | TYPICAL GRADING |
| | Final project 28% |
| | Laboratory pre-lab assignments/lab reports 12% each (6) = 72% total |
| | Back to Standard Syllabi Index |
| | Thursday, August 14, 2008 09:21 AM |
| | Page 2 of 2 |